What Are General Conditions in Construction and What Do They Cover?

October 1, 2026

When a developer or property owner reviews a construction budget for the first time, one line item consistently draws questions: general conditions. The number looks significant – often sitting between five and twelve percent of hard construction costs – and it does not map cleanly to a physical deliverable the way framing or mechanical does. Understanding what general conditions cover and why they cannot simply be cut is essential to reading any construction budget with confidence.

What Are General Conditions in Construction?

General conditions are the project-specific costs required to operate a construction site from mobilization through closeout. They are separate from trade costs, which are tied to specific scopes of work such as concrete, electrical, or mechanical. General conditions are the infrastructure, personnel, and coordination that enable all the trades to function – without them, the site cannot run.

On a typical commercial or multi-family project in Kelowna or the Okanagan, general conditions include the site superintendent’s time, the project manager’s field hours, a site trailer or temporary office, temporary fencing and hoarding, construction signage, site security, waste removal, portable sanitation, temporary utilities, and small equipment rentals not assigned to a specific trade. Larger projects may also include a dedicated safety officer and project coordinator, whose full-time presence is a direct function of project scale and duration.

General Conditions vs. Overhead and Profit

Owners and developers often confuse general conditions with contractor overhead and profit, but the two categories are different. General conditions are project-specific field costs – they exist because this project requires a superintendent, a trailer, and site utilities. Overhead refers to the contractor’s company-level costs: the head office, software, accounting, and insurance that support the business rather than any single project. Profit is the margin earned on the work.

In a construction management arrangement, the construction management fee covers the manager’s overhead and profit. General conditions are passed through separately at actual cost. Understanding this distinction matters when evaluating a quoted fee structure, because combining these two categories creates confusion about what each dollar in the budget is actually covering.

Commercial construction project managed by Team Construction Management in Kelowna

How Much Do General Conditions Cost?

On commercial and multi-family projects in BC, general conditions typically range from five to twelve percent of total construction costs. The percentage varies based on project duration, site complexity, location, and scope. A straightforward tenant improvement with a six-month schedule carries lower general conditions than a 20-month multi-phase development requiring significant temporary site infrastructure.

General conditions are fundamentally time-sensitive costs. A site superintendent working full-time costs the same each month whether the project is on schedule or running behind. Any factor that extends the construction schedule – weather, permit delays, material lead times – increases general conditions accordingly. This relationship between project duration and field costs is one of the reasons construction risk management focuses heavily on protecting the timeline.

Why Reducing General Conditions Creates Risk

Owners reviewing estimates sometimes push back on the general conditions line as a place to cut costs. In practice, a general conditions budget that falls short of what the project actually requires tends to surface as more expensive problems during construction. A site without adequate supervision generates quality deficiencies and rework. Insufficient temporary facilities create inefficiencies that slow trades and extend the overall schedule.

A well-built general conditions estimate reflects the real staffing plan and site requirements for the project, not a generic percentage applied to the budget. When the contingency reserve is consumed by problems that adequate site supervision would have caught, the connection between underfunding general conditions and downstream cost overruns becomes clear. Properly funding general conditions up front is a form of risk mitigation.

Team Construction Management commercial project in Kelowna showing disciplined site management

Reviewing General Conditions in a Project Budget

The most useful way to validate a general conditions number is to compare it against the construction schedule and site staffing plan. A budget that prices eight months of superintendent time for a 14-month project carries an embedded gap. For a $10 million commercial or multi-family construction budget, a general conditions range of five to ten percent represents $500,000 to $1,000,000 in field costs. Understanding what is included in that number – and whether it matches the actual site plan – is a standard part of pre-construction due diligence.

Completed commercial construction in the Okanagan by Team Construction Management

How Team Construction Approaches General Conditions

Team Construction builds general conditions estimates from the ground up for each project, based on a detailed site staffing plan and construction schedule rather than a fixed percentage applied to the budget. If you are planning a commercial or multi-family project in Kelowna or the Okanagan, we would be glad to walk through your budget with you – reach out through our contact page.

.